Release Calendar

CIAO COMMONS — CALENDAR
C-AO/CAL/REL/001:2026 PUBLIC
Release Calendar
Public Schedule of Releases, Pipeline Categories, and Release Event Log
Date Issued  26 April 2026
Review Date  26 April 2027
Cite as: CIAO Standard. (2026). Release Calendar. v1.0. C-AO/CAL/REL/001:2026. www.c-ao.com
🟢 Commons — Public

1. Purpose

The Release Calendar is the public schedule of the CIAO Standard. It states the next scheduled minor release date, the major release horizon, and the cumulative change pipeline organised by category. The Calendar is updated at every release event and at any change to the schedule.

The Calendar is the authoritative source members consult to plan their re-mapping, re-certification, and implementation work against the Standard. Lead-time commitments to members for material and structural changes are honoured through this Calendar in conjunction with direct member notifications, as set out in the Change Management & Versioning Process.

2. Major Release Horizon

Current Major Release
v1.0
Issued 1 January 2026
Next Major Release
v2.0
Scheduled 1 January 2029
Release Cadence
3-yearly
Aligned with ISO MS standards

Major releases occur every three years. Each major release may carry Structural changes — additions to or retirements of CAO domains, restructuring of the tier model, changes to the numbering grammar, changes to the Aggregate Framework triad, changes to the Constitution. Structural changes are reserved for major releases and are subject to a public consultation window of at least sixty days before binding, as set out in the Change Management Process Section 3.

3. Next Minor Release

Target Version
v1.1
First minor within v1.x
Indicative Window
Q3 2026
Confirmed 30 days in advance
Pipeline Items
In formation
Founding-period accumulation

The Standard is in its founding period. The first minor release within the v1.x window will accumulate the changes that the founding-period pipeline produces — material derived from practitioner submissions through the Editorial Submission Framework, Secretariat-initiated proposals, source-standard re-issue triggers, and Panel-initiated proposals. The release date is confirmed once the pipeline contents and review readiness justify a release event, with at least thirty days’ direct notification to affected members per the Change Management Process Section 4.

4. Change Pipeline by Category

The Standard’s change pipeline is organised into four categories, each with its own review pathway and release window. The current state of the pipeline is summarised in the table below; the table is updated at every triage event and at every release event.

Category Pipeline Items Release Pathway Member Notification
Editorial Continuous patches as needed Continuous (no scheduled window) Recorded in version history; no direct notification
Functional Accumulating in founding period Released with next minor or major Through Release Calendar feed
Material Pipeline opens with first practitioner submissions Scheduled minor or major release Direct notification to affected members; 30-day minimum lead time at minor release
Structural Reserved for major releases Major release boundary only 60-day minimum public consultation; direct member notification through that window

5. Release Event Log

The release event log records every release event of the CIAO Standard with version, date, category summary, and link to the change-set detail. The log is append-only and acts as the authoritative public record of how the Standard has changed since v1.0.

Version Date Type Summary
v1.0 1 January 2026 Major Inaugural edition of the CIAO Standard. Founding-period publication with full Class A, B, C, and D document scaffolding.

6. Founding-Period Provisions

The CIAO Standard is in its founding period (Constitution Section 6). During the founding period, the Release Calendar carries the following operational provisions:

The first minor release window is held flexibly to accommodate the maturation of the practitioner pipeline. The Calendar may indicate a target window before that window is binding; firm release dates are communicated thirty days in advance per the Change Management Process Section 4 commitment.

Structural changes made during the founding period are recorded with an explicit “founding-period structural change” annotation in this Calendar’s Release Event Log. Per Constitution Section 6, such changes are subject to ratification by the Oversight Board within ninety days of its formal seating.

This Section 6 sunsets when the Oversight Board is formally seated; at that point the Calendar’s release governance defaults to the standard provisions of the Change Management Process without the founding-period flexibility.

Part of the CIAO Standard administrative instruments — see Standard Administration for the canonical index of operational policies and processes.

● LIVE CONTENT  ·  Verified 29 May 2026 at 15:54 UTC  ·  Version 1.0  ·  Always current at c-ao.com  ·  © CIAO Standard Secretariat 2026